|
|
Recalls for
1972 Streamline Streamline
|
1 recalls found.
|
DEFECT #1 - WHEELS
Posted on: 1979-10-12
Description
Consequence
Corrective Action
Notes
Streamline campaign no n/a.all 29', 31', & 33' travel trailers built betweenaug 1 1971 & nov 30 1972.possibility that the wheels furnished bykelsey-hayes co.were manufactured from steel stock thickness with loadcarrying capacity of 1,550 lbs per wheel instead of required 2,000 pounds.(correct by inspecting and replacing wheels with wheel load carrying capacityof 2000 pounds.)